Query about Question 1 from "PrepSwift: Identical Machines" [3290]

https://www.gregmat.com/quizzes/quiz/prepswift-identical-machines (Question 1)


can somebody provide the solution to this describing the technique used in the video?

The thing to consider here is that the rate of identical machines shall always remain the same, unless specified.

Total work done = rate of one machine x no. of machines x total time taken to complete work

So 100 balls = 4 machines x rate of one machine (in balls per hour) x 5 hours

rate of one machine = 100 / (4*5) = 100 / 20 = 5 balls in one hour

Next, the revised total amount of work is 400 balls. Rate of one machine remains the same.

Plugging it back in work rate formula:

400 = 5 balls/hour x no. of machines x 5 hours

so no. of machines = 400 / (5*5) = 400/25 = 16 machines

The question is asking the “additional” number of machines required for this task of producing 400 balls. So that’s 16 total machines minus the 4 machines which we already had in the first place = 12 machines additional.