Question 13 Quantitative Reasoning Mixed Practice 5- faster methodology to calculate machine schedules?

Hi, is there a way to solve this question without painstakingly writing out the entire schedule?

In a factory, machine A operates on a cycle of 20 hours of work followed by 4 hours of rest, and machine B operates on a cycle of 40 hours of work followed by 8 hours of rest. Last week, the two machines began their respective cycles at 12 noon on Monday and continued until 12 noon on the following Saturday. On which days during that time period was there a time when both machines
were at rest?

Indicate all such days.
A) Monday
B )Tuesday
C) Wednesday
D) Thursday
E) Friday
F) Saturday

I struggled to calculate using equations and then it became a huge time sink writing out by hand.

Approach 1

Machine A has a 24-hour cycle (20hrs of work + 4hrs of rest), so it rests at the same time every day ie 8am to noon, starting Tuesday.

Machine B has a 48-hour cycle (40hrs of work + 8hrs of rest), so it rests from 4am to noon on Wednesday and Friday.

Since Machine A is also resting from 8am to noon on both days, the answer is Wednesday and Friday.

Approach 2

List out the rest time after the start in hours. Saturday, 12 noon is exactly 120hrs after the start so we can stop the list around there.

A: [20-24] [44-48] [68-72] [92-96] [116-120]

B: [40-48] [88-96]

The overlaps become clear.

44-48hrs \rightarrow Wednesday

and

92-96hrs \rightarrow Friday